Skarv-Idun FPSO

Aker Kvaerner Engineering and Technology (AKET) and BP Norge

Location
Norwegian North Sea
Industry Served
Region
Europe

Scope of Work

FEED, Detailed Engineering, Procurement Services and Construction Management

Summary

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern part of the North Sea, off the coast of Norway, close to the Norne, Heidrun and Asfard fields. The unit was designed to produce 85,000 barrels of oil and 670 million standard cubic feet of gas per day. The Skarv-Idun FPSO was the largest North Sea unit of its kind designed when McDermott undertook the project.

McDermott provided a multi-discipline team of engineers and designers to assist in the completion of the FEED in AKET’s project office in Oslo, Norway. The team familiarized itself with the project issues for the EPCm phase while performing the FEED. McDermott’s scope of work for the EPCm phase included detailed design for the P-500 and P-600 separation, water treatment and chemical injection process modules. 




Related Projects

Aasta Hansteen Spar Topsides

Aasta Hansteen Spar Topsides

Norwegian North Sea

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Angelin

Angelin

Trinidad and Tobago

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Argentina Propane/Butane Export Terminal

Argentina Propane/Butane Export Terminal

Puerto Galvan, Bahia Blanca, Argentina

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Arthit Central Processing Platform

Arthit Central Processing Platform

Arthit field, Gulf of Thailand

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Ayatsil-B Drilling Platform

Ayatsil-B Drilling Platform

Ayatsil Field, Bay of Campeche, Mexico

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Ayatsil-C

Ayatsil-C

Ayatsil-Tekel field, Mexico, Bay of Campeche, Mexico

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Baku-Tbilisi-Ceyhan Pipeline

Baku-Tbilisi-Ceyhan Pipeline

Baku, Azerbaijan to Ceyhan, Turkey via Tbilisi, Georgia

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Baobab FPSO Topsides

Baobab FPSO Topsides

Offshore Ivory Coast, West Africa

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Buzzard Enhancement Platform

Buzzard Enhancement Platform

Central North Sea, off the Coast of the United Kingdom

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Buzzard Offshore Platform Topsides

Buzzard Offshore Platform Topsides

North Sea

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Goliat FPSO Project

Goliat FPSO Project

Norwegian Continental Shelf

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Gorgon Project PAR/PAUs

Gorgon Project PAR/PAUs

Barrow Island LNG Plant, Western Australia

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Gorgon Subsea Project

Gorgon Subsea Project

North West Shelf, Western Australia

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Greater Ekofisk Area FEED

Greater Ekofisk Area FEED

Norwegian North Sea

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Hoegh LNG FPSO

Hoegh LNG FPSO

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Ichthys LNG Project

Ichthys LNG Project

Northern Browse Basin, Western Australia

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Jack and St. Malo

Jack and St. Malo

Walker Ridge, Gulf of Mexico

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Julia Phase 1 Development

Julia Phase 1 Development

Julia Field, Walker Ridge, Gulf of Mexico

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Kashagan Full Field Development Project

Kashagan Full Field Development Project

North Caspian Sea

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Khuff Gas Development Platform

Khuff Gas Development Platform

150 kilometers off the coast of Abu Dhabi

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Kizomba A Tension Leg Platform

Kizomba A Tension Leg Platform

Approximately 1,250 meters of water, off the coast of Angola

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Kuil-A Drilling Platform

Kuil-A Drilling Platform

Kuil field in the Bay of Campeche, Mexico

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Magnolia Tension Leg Platform

Magnolia Tension Leg Platform

Offshore in the Gulf of Mexico

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Maloob-C Drilling Platform

Maloob-C Drilling Platform

Ku-Maloob-Zaap field in the Bay of Campeche, Mexico

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Otis

Otis

Mississippi Canyon, Gulf of Mexico

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Papa Terra Tension Leg Wellhead Platform

Papa Terra Tension Leg Wellhead Platform

Block BC-20; Campos Basin, Brazil

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

PB-Litoral-A Production Platform

PB-Litoral-A Production Platform

Litoral Tabasco Tsimin-Xux field, Mexico

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Phase V

Phase V

North West Shelf, offshore Western Australia

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Qatargas Common Condensate SPM Facilities

Qatargas Common Condensate SPM Facilities

North Field, Qatar, Arabian Gulf

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Siakap North-Petai

Siakap North-Petai

Siakap North-Petai, Block K, offshore Sabah, Malaysia

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Skarv-Idun FPSO

Skarv-Idun FPSO

Norwegian North Sea

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

South Caucasus Pipeline

South Caucasus Pipeline

Sangachal, Azerbaijan—South of Baku—to the Turkish border

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Su Tu Vang Central Processing Platform

Su Tu Vang Central Processing Platform

Vietnam in the Mekong Basin

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Tupi-1 FPSO

Tupi-1 FPSO

Santos Basin, offshore Brazil

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

Tupi-3 Guara FPSO

Tupi-3 Guara FPSO

Santos Basin, offshore Brazil

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted McDermott to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO. The Skarv project is located in the harsh environment of the northern...

What We Do
Contact our experts

Contact Our Experts

Security code