Subsea & Floating Facilities - FPU & FPSO
Scarborough Project
32,000 MT

topside structure

2,000 employees

approximately working on site

Scope
FEED & EPC
Location
Australia
Highlights
  • In the top five of largest semi-submersible floating facilities ever built in the world 
  • When complete, the topside structure alone will weigh more than 32,000 MT, and when you add the hull, that weight more than doubles 
  • In designing the FPU, McDermott has reduced the annual operational emissions of the facility by approximately 15% through the use of a hybrid gas-turbine and battery energy storage power system, combined with the use of waste heat recovery units

The project's extensive scope includes the full suite of engineering, procurement, construction, installation, and commissioning (EPCIC) services, as well as the design, fabrication, integration, transportation, and installation of the FPU's hull and topsides.