Subsea & Floating Facilities - Subsea Field Development
KG-DWN-98/2 Subsea Development
984 to 4,921 feet

water depth

5 locations

engineering executed

Scope
EPCI & Pre-commissioning
Location
East Coast of India
Highlights
  • India's largest integrated subsea development 
  • Executing the engineering, procurement, construction, installation, and pre-commissioning of subsea umbilicals, risers and flowlines (SURF) at water depths between 984 feet (300 meters) and 4,921 feet (1,500 meters)
  • When completed the project is expected to contribute 7% to the country's overall natural gas output following the start of hydrocarbon production in its KG-DWN-98/2 block - a major boost to energy security

The integrated subsea package includes the supply of all subsea production systems (SPS), including deepwater trees, and the installation of pipelines, subsea umbilicals, risers and flowlines (SURF). First gas was achieved in March 2020, followed by the completion of the partial gas system in September 2021. In January 2024, first oil was also achieved.