Baobab FPSO Topsides

MODEC Offshore Production Systems

Location
Offshore Ivory Coast, West Africa
Industry Served
Region
Africa

Scope of Work

Detailed engineering and procurement services

Summary

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 




Related Projects

Aasta Hansteen Spar Topsides

Aasta Hansteen Spar Topsides

Norwegian North Sea

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Angelin

Angelin

Trinidad and Tobago

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Argentina Propane/Butane Export Terminal

Argentina Propane/Butane Export Terminal

Puerto Galvan, Bahia Blanca, Argentina

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Arthit Central Processing Platform

Arthit Central Processing Platform

Arthit field, Gulf of Thailand

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Ayatsil-B Drilling Platform

Ayatsil-B Drilling Platform

Ayatsil Field, Bay of Campeche, Mexico

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Ayatsil-C

Ayatsil-C

Ayatsil-Tekel field, Mexico, Bay of Campeche, Mexico

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Baku-Tbilisi-Ceyhan Pipeline

Baku-Tbilisi-Ceyhan Pipeline

Baku, Azerbaijan to Ceyhan, Turkey via Tbilisi, Georgia

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Baobab FPSO Topsides

Baobab FPSO Topsides

Offshore Ivory Coast, West Africa

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Buzzard Enhancement Platform

Buzzard Enhancement Platform

Central North Sea, off the Coast of the United Kingdom

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Buzzard Offshore Platform Topsides

Buzzard Offshore Platform Topsides

North Sea

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Goliat FPSO Project

Goliat FPSO Project

Norwegian Continental Shelf

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Gorgon Project PAR/PAUs

Gorgon Project PAR/PAUs

Barrow Island LNG Plant, Western Australia

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Gorgon Subsea Project

Gorgon Subsea Project

North West Shelf, Western Australia

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Greater Ekofisk Area FEED

Greater Ekofisk Area FEED

Norwegian North Sea

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Hoegh LNG FPSO

Hoegh LNG FPSO

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Ichthys LNG Project

Ichthys LNG Project

Northern Browse Basin, Western Australia

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Jack and St. Malo

Jack and St. Malo

Walker Ridge, Gulf of Mexico

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Julia Phase 1 Development

Julia Phase 1 Development

Julia Field, Walker Ridge, Gulf of Mexico

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Kashagan Full Field Development Project

Kashagan Full Field Development Project

North Caspian Sea

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Khuff Gas Development Platform

Khuff Gas Development Platform

150 kilometers off the coast of Abu Dhabi

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Kizomba A Tension Leg Platform

Kizomba A Tension Leg Platform

Approximately 1,250 meters of water, off the coast of Angola

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Kuil-A Drilling Platform

Kuil-A Drilling Platform

Kuil field in the Bay of Campeche, Mexico

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Magnolia Tension Leg Platform

Magnolia Tension Leg Platform

Offshore in the Gulf of Mexico

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Maloob-C Drilling Platform

Maloob-C Drilling Platform

Ku-Maloob-Zaap field in the Bay of Campeche, Mexico

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Molikpaq Oil Treatment & Gas Disposition

Molikpaq Oil Treatment & Gas Disposition

Russia, offshore of Sakhalin Island

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Otis

Otis

Mississippi Canyon, Gulf of Mexico

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Papa Terra Tension Leg Wellhead Platform

Papa Terra Tension Leg Wellhead Platform

Block BC-20; Campos Basin, Brazil

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

PB-Litoral-A Production Platform

PB-Litoral-A Production Platform

Litoral Tabasco Tsimin-Xux field, Mexico

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Phase V

Phase V

North West Shelf, offshore Western Australia

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Qatargas Common Condensate SPM Facilities

Qatargas Common Condensate SPM Facilities

North Field, Qatar, Arabian Gulf

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Siakap North-Petai

Siakap North-Petai

Siakap North-Petai, Block K, offshore Sabah, Malaysia

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Skarv-Idun FPSO

Skarv-Idun FPSO

Norwegian North Sea

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

South Caucasus Pipeline

South Caucasus Pipeline

Sangachal, Azerbaijan—South of Baku—to the Turkish border

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Su Tu Vang Central Processing Platform

Su Tu Vang Central Processing Platform

Vietnam in the Mekong Basin

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Tupi-1 FPSO

Tupi-1 FPSO

Santos Basin, offshore Brazil

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Tupi-3 Guara FPSO

Tupi-3 Guara FPSO

Santos Basin, offshore Brazil

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

Yemen LNG Cryogenic Gas Plant

Yemen LNG Cryogenic Gas Plant

Marib, Yemen

The project consisted of a 70,000 BPD and 90 MMSCFD Floating Production Storage and Offloading (FPSO) facility. With a total weight of approximately 6,500 metric tons, the topsides modules were installed onto a converted FPSO hull. 

In order to provide complete functionality, this web site needs your explicit consent to store browser cookies. It is recommended that you allow all cookies.