Skip to main content
Onshore - LNG Solutions
Golden Pass LNG Project in Texas
Three-train

LNG facility

15.6 MTPA

export capacity

>7,000

workforce

11 million hours

without a lost time incident 

Scope
EPC & Commissioning
Location
Sabine Pass, Texas
Highlights
  • McDermott assumed the role as joint venture lead during the project execution 
  • Expansion of existing regasification facility built by McDermott, completed in 2010
  • Utilizes APCI propane pre-cooled, mixed refrigerant (C3MR) process 
  • Electric power generated by steam from heat recovery steam generation units 

Lead partner in a joint venture with Chiyoda responsible for engineering, procurement, construction and commissioning of LNG liquefaction plant. The scope includes three liquefaction trains and all necessary process and utility units. The project utilizes the existing LNG storage and marine facilities upgraded to enable loading of Qmax-size LNG tankers.