Onshore - LNG Solutions

Three-train
LNG facility
15.6 MTPA
export capacity
>7,000
workforce
11 million hours
without a lost time incident
Scope
EPC & Commissioning
Location
Sabine Pass, Texas
Highlights
- McDermott assumed the role as joint venture lead during the project execution
- Expansion of existing regasification facility built by McDermott, completed in 2010
- Utilizes APCI propane pre-cooled, mixed refrigerant (C3MR) process
- Electric power generated by steam from heat recovery steam generation units
Lead partner in a joint venture with Chiyoda responsible for engineering, procurement, construction and commissioning of LNG liquefaction plant. The scope includes three liquefaction trains and all necessary process and utility units. The project utilizes the existing LNG storage and marine facilities upgraded to enable loading of Qmax-size LNG tankers.