Energy Transition - Offshore Wind
900MW HVDC
marine station
4,800 T
reference plant and design
17,600 t
topsides Wt.
36.8m
water depth
Scope
EPFC
Location
Offshore Germany
Highlights
- Engineering, procurement, fabrication, transportation, installation and commissioning for topside module and the jacket plus piles
The project reached one million work hours without a lost-time incident during the fabrication of the platform at the Jebel Ali yard in Dubai. Another impressive milestone was the safe and successful stacking of deck level one and double bottom which was conducted in a tandem lift involving an arrangement of six cranes. This complex operation had a lift weight of 1,962 MT and represented the heaviest stacking ever performed at Jebel Ali.