2024

mechanical completion

2024

seventh SRT III heater installed

10.8 million

safe work hours

6,833 MT

of steel

246,571 meters

of cable

162,779 meters

of pipe

Scope
FEED & EPC
Location
Louisiana
Highlights

As part of the FEED, McDermott provided a basic engineering package used as the basis for a binding open book cost estimate for the EPC.

McDermott worked through all phases of pre-FEED, FEED, EPC, and commissioning and start-up support for its 1,000 kta ethane cracker. Approximately half of the ethylene produced in this world-class facility supplies Lotteā€™s 700 kta mono-ethylene glycol (MEG) production plant, which produces fiber-grade MEG for export. McDermott has continued work at the facility through 2024 by designing and installing a seventh SRT III ethylene heater and a duplicate auxiliary boiler.