Energy Transition - Hydrogen

In 2026
project is intended to provide green hydrogen to the Netherlands.
Imperative to meeting
the Netherlands 2030 climate goals
Scope
Study & Pre-FEED
Location
The Netherlands
Highlights
- Transforming the Rotterdam facility into a green energy hub
- Feasibility study completed
- Leveraging ammonia tank construction experience
- Ensuring a reliable logistical chain for the growing green hydrogen market
McDermott delivered FEED activities for the interconnecting pipeline, tie-ins and other Outside Battery Limits (OSBL) scope. As part of the FEED, a project execution cost estimate was developed as the basis for a potential conversion into an EPC contract for the implementation phase.