Skip to main content
Energy Transition - Low Carbon Pathways
Freeport LNG
3 x 4.4 MTPA

LNG export facility

165,000 m3

full containment LNG storage tank

80% to 105%

speed range

APCI

C3MR technology

Scope
Pre-FEED, FERC FEED & EPFC
Location
Freeport, TX
Highlights
  • Gas pretreatment facility 
  • Loading berth 
  • Common utilities and infrastructure 
  • 75MW each/ total capacity of 450MW 
  • Flexibility in operation utilizing an LCI VFD Driver with 
  • Design of Active Front End 5-stage Harmonic Filter

Under the FEED Contract, the Zachry/McDermott Joint Venture engineered and designed three LNG liquefaction trains (each rated at 4.4 million tons per year) and corresponding pretreatment facilities to be located near the existing Freeport LNG Regasification Terminal. 

The EPC project scope includes engineering, procurement, and construction for three trains and also includes a double-walled, full containment 165,000 (gross) cubic meter liquefied natural gas (LNG) storage tank, which will be supplied by McDermott.