Onshore - Modular Fabrication

930MW
Offshore HVDC
17.5K
metric tons platform
900MW
HVDC marine station
4,800 tons
Jacket weight
17,600 tons
Topsides weight
36.8 meters
Water depth
Scope
EPCIC
Location
Netherlands/Germany
Highlights
- Critical infrastructure and grid connection project
- Signified McDermott’s expansion into the thriving offshore wind market
- Demonstrated McDermott’s in-house design, fabrication, and offshore transportation and installation capabilities in a new industry
The project reached one million work hours without a lost-time incident during the fabrication of the platform at the Jebel Ali yard in Dubai. Another impressive milestone was the safe and successful stacking of deck level one and double bottom which was conducted in a tandem lift involving an arrangement of six cranes. This complex operation had a lift weight of 1,962 MT, and represented the heaviest stacking ever performed at Jebel Ali.