Ayatsil-Tekel field, Mexico, Bay of Campeche, Mexico
The topsides designed had a weight of 6,500 metric tonnes. The facilities consisted of a production sweetening platform and a bridge that linked the newest platform to the three existing Buzzard Complex platforms.