Recent Projects

PB-Litoral-A Production Platform

    The Litoral field is expected to produce high-quality, light oil for export. McDermott provided PEMEX with a turnkey solution utilizing advanced float-over technology to install the 7,657-ton production deck in the Bay of Campeche, Mexico. This was the first float over performed by McDermott for PEMEX.

    Client: PEMEX Exploración y Producción
    Services: Engineering, procurement, construction, transportation, installation commissioning and start-up
    Facilities: Total weight approximately 12,955 ST
    Location: Litoral Tabasco Tsimin-Xux field, Mexico
    Water Depth: 85 feet
    Yard: Altamira, Mexico
    Vessels: Derrick Barge 50, Intermac 600

    Data Sheet:   Imperial (PDF)


    PB Litoral A Completion 

     

     

    Related Projects

    This is a unique website which will require a more modern browser to work! Please upgrade today!