Intermac 650


    Ideally configured for deep-water jacket launch and large deck float-over installation projects


    • Second-largest floatover installation vessel in the world
    • Four double-action hydraulic jacks can be arranged to load a structure from shore and reposition it offshore for launching or float-over installation
    • Sensitive ballast system fitted using diesel pumps and 16 hydraulically operated rapid flood bottom valves
    • Centrally located controls including remote tank level gauging

    Data Sheet:   Download (PDF)


    Related Projects

    This is a unique website which will require a more modern browser to work! Please upgrade today!